• Release date Oct 2026
  • This asic was recently released!
    All calculations are estimates. The profitability will likely change after more asics are delivered to users.
  • SHA-256 10.00 Th/s @ 300W
Customize this ASIC
Th/s
BC2
W
%
BTC
$/kWh
$
$

BitcoinII (BC2) Estimated Mining Rewards

Per Fees Est. Rewards Rev. BTC Rev. $ Cost Profit
Hour 0.000000 0.098870 0.000000 $0.01 $0.03 -$0.02
Day 0.000000 2.372892 0.000003 $0.27 $0.72 -$0.45
Speculative
Week 0.000000 16.610242 0.000023 $1.87 $5.04 -$3.17
Month 0.000000 71.186750 0.000099 $8.03 $21.60 -$13.57
Historical
Last Hour 0.000000 0.172720 0.000000 $0.02 $0.03 -$0.01
Last Day 0.000000 2.372892 0.000003 $0.27 $0.72 -$0.45
Last 3 Days 0.000000 7.355628 0.000010 $0.83 $2.16 -$1.33
Last Week 0.000000 17.408497 0.000024 $1.96 $5.04 -$3.08

Mining BitcoinII (BC2) on the Heatbit Canvas with 10.00 Th/s at 300 W currently earns about 2.373 BC2 ($0.27) per day, but runs at a loss of $0.45 per day at $0.10/kWh. Network hashrate is 10.60 Ph/s, with a block reward of 50.00 BC2 every 16m 22s. Compare other ASIC miners for BitcoinII or other coins the Canvas can mine.

BitcoinII (BC2) Exchange Rates

Exchange Current Rate Volume 24h 24h Rate 3d Rate 7d Rate
Nonkyc 138.8463 sat 0.94 BTC 167.2364 sat 170.5974 sat 162.4161 sat

BitcoinII (BC2) Mining Pools

Pool Location Fee Hashrate Hashrate % Miners
zpool SHA-256 EU, US 1.00% 0.00 h/s Multi-coin pool 0
1Miner.net US, EU, Asia 1.00% 43.62 Th/s 0.4% 5
Mining-Dutch EU 2.00% 453.80 Th/s 4.3% 70