• Release date Mar 2025
  • This ASIC is not yet available!
    All calculations are estimates. The profitability will likely change after the miner is released.
  • Manufacturer page DG Hydro 1
  • Scrypt 20.00 Gh/s @ 6200W
Gh/s
SOH
W
%
BTC
$/kWh
$
$
Estimated Rewards
Per Fees Est. Rewards Rev. BTC Rev. $ Cost Profit
Hour 0.000000 4.140635 0.000000 $0.04 $0.62 -$0.58
Day 0.000000 99.375248 0.000009 $0.89 $14.88 -$13.99
Speculative
Week 0.000000 695.626739 0.000064 $6.25 $104.16 -$97.91
Month 0.000000 2,981.257451 0.000275 $26.79 $446.40 -$419.61
Historical
Last Hour 0.000000 4.140635 0.000000 $0.04 $0.62 -$0.58
Last Day 0.000000 99.375248 0.000009 $0.89 $14.88 -$13.99
Last 3 Days 0.000000 303.834831 0.000028 $2.73 $44.64 -$41.91
Last Week 0.000000 726.275310 0.000067 $6.53 $104.16 -$97.63
Exchange Rates
Exchange Current Rate Volume 24h 24h Rate 3d Rate 7d Rate
Mexc 9.2126 sat 0.13 BTC 8.4515 sat 8.7482 sat 8.6862 sat
Bitcointry 8.9017 sat 0.02 BTC 8.7415 sat 8.8355 sat 8.7885 sat
Mining Pools
Pool Location Fee Hashrate Hashrate % Miners
Zergpool Scrypt EU 0.50% 0.00 h/s Multi-coin pool 0
Bowserlab Scrypt 1.00% 0.00 h/s Multi-coin pool 0
zpool Scrypt EU, US 1.00% 2.82 Gh/s Multi-coin pool 6
Mining-Dutch EU 2.00% 4.43 Gh/s 106.7% 30