• Release date Mar 2025
  • This ASIC is not yet available!
    All calculations are estimates. The profitability will likely change after the miner is released.
  • Manufacturer page DG Hydro 1
  • Scrypt 20.00 Gh/s @ 6200W
Gh/s
BEL
W
%
BTC
$/kWh
$
$
Estimated Rewards
Per Fees Est. Rewards Rev. BTC Rev. $ Cost Profit
Hour 0.000000 0.009560 0.000000 $0.00 $0.62 -$0.62
Day 0.000000 0.229440 0.000000 $0.04 $14.88 -$14.84
Speculative
Week 0.000000 1.606079 0.000003 $0.29 $104.16 -$103.87
Month 0.000000 6.883194 0.000013 $1.26 $446.40 -$445.14
Historical
Last Hour 0.000000 0.010683 0.000000 $0.00 $0.62 -$0.62
Last Day 0.000000 0.229440 0.000000 $0.04 $14.88 -$14.84
Last 3 Days 0.000000 0.704787 0.000001 $0.13 $44.64 -$44.51
Last Week 0.000000 1.702703 0.000003 $0.31 $104.16 -$103.85
Exchange Rates
Exchange Current Rate Volume 24h 24h Rate 3d Rate 7d Rate
TradeOgre 189.5468 sat 0.02 BTC 188.9448 sat 182.3759 sat 194.3109 sat
Mining Pools
Pool Location Fee Hashrate Hashrate % Miners
Zergpool Scrypt EU 0.50% 233.04 Gh/s Multi-coin pool 241
zpool Scrypt EU, US 1.00% 130.45 Gh/s Multi-coin pool 177
Bowserlab Scrypt 1.00% 0.00 h/s Multi-coin pool 0