• Release date
    Delisted until we can confirm availability
  • ETH mining is scheduled to end in late 2022 / early 2023
  • Manufacturer page RS Pro
  • Ethash 1.20 Gh/s @ 1320W
  • Ethash4G 1.20 Gh/s @ 1320W
Mh/s
LRS
W
%
BTC
$/kWh
$
$
Estimated Rewards
Per Fees Est. Rewards Rev. BTC Rev. $ Cost Profit
Hour 0.000000 7.377122 0.000000 $0.04 $0.13 -$0.09
Day 0.000000 177.050917 0.000010 $0.93 $3.17 -$2.24
Speculative
Week 0.000000 1,239.356418 0.000071 $6.52 $22.18 -$15.65
Month 0.000000 5,311.527508 0.000302 $27.95 $95.04 -$67.09
Historical
Last Hour 0.000000 7.183287 0.000000 $0.04 $0.13 -$0.09
Last Day 0.000000 177.050917 0.000010 $0.93 $3.17 -$2.24
Last 3 Days 0.000000 521.541979 0.000030 $2.74 $9.50 -$6.76
Last Week 0.000000 1,151.825295 0.000066 $6.06 $22.18 -$16.12
Exchange Rates
Exchange Current Rate Volume 24h 24h Rate 3d Rate 7d Rate
Nonkyc 5.6945 sat 0.11 BTC 5.3024 sat 5.1996 sat 5.3161 sat
Mining Pools
Pool Location Fee Hashrate Hashrate % Miners
gtpool US, EU, Asia 1.00% 98.75 Gh/s 94.3% 85
CoolPool EU, US, ASIA 1.00% 12.19 Gh/s 11.6% 5