• Release date
    Delisted until we can confirm availability
  • ETH mining is scheduled to end in late 2022 / early 2023
  • Manufacturer page RS Pro
  • Ethash 1.20 Gh/s @ 1320W
  • Ethash4G 1.20 Gh/s @ 1320W
Mh/s
DOGETHER
W
%
BTC
$/kWh
$
$
Estimated Rewards
Per Fees Est. Rewards Rev. BTC Rev. $ Cost Profit
Hour 0.000000 171,666.503739 0.000002 $0.11 $0.13 -$0.02
Day 0.000000 4,119,996.089733 0.000040 $2.68 $3.17 -$0.49
Speculative
Week 0.000000 28,839,972.628134 0.000277 $18.75 $22.18 -$3.43
Month 0.000000 123,599,882.692002 0.001186 $80.34 $95.04 -$14.70
Historical
Last Hour 0.000000 171,510.618527 0.000002 $0.11 $0.13 -$0.02
Last Day 0.000000 4,119,996.089733 0.000040 $2.68 $3.17 -$0.49
Last 3 Days 0.000000 11,115,233.936092 0.000107 $7.22 $9.50 -$2.28
Last Week 0.000000 24,111,037.335091 0.000231 $15.67 $22.18 -$6.50
Exchange Rates
Exchange Current Rate Volume 24h 24h Rate 3d Rate 7d Rate
XeggeX 0.0010 sat 0.00 BTC 0.0007 sat 0.0008 sat 0.0009 sat
Mining Pools
Pool Location Fee Hashrate Hashrate % Miners
gtpool US, EU, Asia 1.00% 56.18 Gh/s 126.2% 95
CoolPool EU, US, ASIA 1.00% 939.67 Mh/s 2.1% 4