• Release date
  • ETH mining finished on 15th September 2022
  • Manufacturer page A10 ETHMaster 500Mh
  • Ethash 0.00 h/s @ 750W
  • Ethash4G 500.00 Mh/s @ 750W
Mh/s
ETHW
W
%
BTC
$/kWh
$
$
Estimated Rewards
Per Fees Est. Rewards Rev. BTC Rev. $ Cost Profit
Hour 0.000000 0.000000 0.000000 $0.00 $0.07 -$0.07
Day 0.000000 0.000000 0.000000 $0.00 $1.80 -$1.80
Speculative
Week 0.000000 0.000000 0.000000 $0.00 $12.60 -$12.60
Month 0.000000 0.000000 0.000000 $0.00 $54.00 -$54.00
Historical
Last Hour 0.000000 0.000000 0.000000 $0.00 $0.07 -$0.07
Last Day 0.000000 0.000000 0.000000 $0.00 $1.80 -$1.80
Last 3 Days 0.000000 0.000000 0.000000 $0.00 $5.40 -$5.40
Last Week 0.000000 0.000000 0.000000 $0.00 $12.60 -$12.60
Exchange Rates
Exchange Current Rate Volume 24h 24h Rate 3d Rate 7d Rate
WhiteBIT 379.0819 sat 1.67 BTC 383.5646 sat 374.6285 sat 374.3310 sat
MEXC 378.0080 sat 0.90 BTC 383.0106 sat 374.0499 sat 373.7277 sat
CoinEx 378.6615 sat 0.20 BTC 383.4869 sat 374.3306 sat 373.7098 sat
Gate.io 378.3148 sat 0.10 BTC 382.5251 sat 373.6464 sat 373.2346 sat
Mining Pools
Pool Location Fee Hashrate Hashrate % Miners
1pool US, EU, Asia 0.33% 1.66 Gh/s 0.1% 14
WoolyPooly USA, EU 0.90% 2.32 Gh/s 0.1% 7
CoolPool EU, US, ASIA 1.00% 8.80 Gh/s 0.5% 5
Kryptex EU, US, SG, RU 1.00% 103.74 Gh/s 6.3% 55
gtpool US, EU, Asia 1.00% 726.08 Gh/s 44.1% 463
K1Pool US, EU, Asia 1.00% 355.91 Gh/s 21.6% 199
f2pool CN, US, EU 2.50% 178.73 Gh/s 10.9%