• Release date Mar 2025
  • This ASIC is not yet available!
    All calculations are estimates. The profitability will likely change after the miner is released.
  • Manufacturer page DG Hydro 1
  • Scrypt 20.00 Gh/s @ 6200W
Gh/s
DGB
W
%
BTC
$/kWh
$
$
Estimated Rewards
Per Fees Est. Rewards Rev. BTC Rev. $ Cost Profit
Hour 0.000000 17.028634 0.000002 $0.22 $0.62 -$0.40
Day 0.000000 408.687212 0.000052 $5.35 $14.88 -$9.53
Speculative
Week 0.000000 2,860.810487 0.000362 $37.42 $104.16 -$66.74
Month 0.000000 12,260.616372 0.001550 $160.37 $446.40 -$286.03
Historical
Last Hour 0.000000 16.996831 0.000002 $0.22 $0.62 -$0.40
Last Day 0.000000 408.687212 0.000052 $5.35 $14.88 -$9.53
Last 3 Days 0.000000 1,216.798157 0.000154 $15.92 $44.64 -$28.72
Last Week 0.000000 2,770.420709 0.000350 $36.24 $104.16 -$67.92
Exchange Rates
Exchange Current Rate Volume 24h 24h Rate 3d Rate 7d Rate
Binance 12.6443 sat 19.69 BTC 12.9698 sat 12.8381 sat 12.7472 sat
Mining Pools
Pool Location Fee Hashrate Hashrate % Miners
Zergpool Scrypt EU 0.50% 419.42 Mh/s Multi-coin pool 38
zpool Scrypt EU, US 0.95% 1.72 Gh/s Multi-coin pool 3
PowerPool Scrypt EU, US, ASIA 1.00% 16.81 Th/s Multi-coin pool 2902
Prohashing Scrypt US, EU 1.99% 368.44 Gh/s Multi-coin pool 222
Mining-Dutch EU 2.00% 4.79 Th/s 28.9% 9319