• Release date Oct 2016
  • Zhash 32.50 h/s @ 90W
h/s
BTCZ
W
%
BTC
$/kWh
$
$

BitcoinZ (BTCZ) Estimated Mining Rewards

Per Fees Est. Rewards Rev. BTC Rev. $ Cost Profit
Hour 0.000000 182.598100 0.000000 $0.00 $0.01 -$0.01
Day 0.000000 4,382.354401 0.000001 $0.05 $0.22 -$0.16
Speculative
Week 0.000000 30,676.480808 0.000004 $0.36 $1.51 -$1.15
Month 0.000000 131,470.632036 0.000019 $1.53 $6.48 -$4.95
Historical
Last Hour 0.000000 169.573722 0.000000 $0.00 $0.01 -$0.01
Last Day 0.000000 4,382.354401 0.000001 $0.05 $0.22 -$0.16
Last 3 Days 0.000000 13,336.615556 0.000002 $0.16 $0.65 -$0.49
Last Week 0.000000 33,129.423714 0.000005 $0.39 $1.51 -$1.13

Mining BitcoinZ (BTCZ) on the NVIDIA GeForce GTX 1060 6GB with 32.50 h/s at 90 W currently earns about 4,382 BTCZ ($0.05) per day, but runs at a loss of $0.16 per day at $0.10/kWh. Network hashrate is 12.80 kh/s, with a block reward of 2,500.00 BTCZ every 2m 31s. Compare other GPUs for mining BitcoinZ or other coins to mine with the GeForce GTX 1060 6GB.

BitcoinZ (BTCZ) Exchange Rates

Exchange Current Rate Volume 24h 24h Rate 3d Rate 7d Rate
SafeTrade 0.0145 sat 0.01 BTC 0.0374 sat 0.0381 sat 0.0401 sat
WhiteBIT 0.0306 sat 0.00 BTC 0.0307 sat 0.0326 sat 0.0340 sat

BitcoinZ (BTCZ) Mining Pools

Pool Location Fee Hashrate Hashrate % Miners
zpool Zhash EU, US 1.00% 12.53 kh/s Multi-coin pool 2