• Release date Mar 2025
  • This ASIC is not yet available!
    All calculations are estimates. The profitability will likely change after the miner is released.
  • Manufacturer page DG Hydro 1
  • Scrypt 20.00 Gh/s @ 6200W
Gh/s
CAT
W
%
BTC
$/kWh
$
$
Estimated Rewards
Per Fees Est. Rewards Rev. BTC Rev. $ Cost Profit
Hour 0.000000 0.966692 0.000001 $0.09 $0.62 -$0.53
Day 0.000000 23.200609 0.000022 $2.13 $14.88 -$12.75
Speculative
Week 0.000000 162.404261 0.000153 $14.94 $104.16 -$89.22
Month 0.000000 696.018262 0.000654 $64.03 $446.40 -$382.37
Historical
Last Hour 0.000000 1.072452 0.000001 $0.10 $0.62 -$0.52
Last Day 0.000000 23.200609 0.000022 $2.13 $14.88 -$12.75
Last 3 Days 0.000000 61.801279 0.000058 $5.69 $44.64 -$38.95
Last Week 0.000000 129.677173 0.000122 $11.93 $104.16 -$92.23
Exchange Rates
Exchange Current Rate Volume 24h 24h Rate 3d Rate 7d Rate
Nonkyc 94.0200 sat 0.01 BTC 98.0922 sat 105.2933 sat 113.2404 sat
Mining Pools
Pool Location Fee Hashrate Hashrate % Miners
Zergpool Scrypt EU 0.50% 0.00 h/s Multi-coin pool 0
zpool Scrypt EU, US 1.00% 0.00 h/s Multi-coin pool 0
Bowserlab Scrypt 1.00% 0.00 h/s Multi-coin pool 0
Mining-Dutch EU 2.00% 98.93 Gh/s 8.4% 10