• Release date Mar 2025
  • This ASIC is not yet available!
    All calculations are estimates. The profitability will likely change after the miner is released.
  • Manufacturer page DG Hydro 1
  • Scrypt 20.00 Gh/s @ 6200W
Gh/s
CAT
W
%
BTC
$/kWh
$
$
Estimated Rewards
Per Fees Est. Rewards Rev. BTC Rev. $ Cost Profit
Hour 0.000000 0.289196 0.000002 $0.24 $0.62 -$0.38
Day 0.000000 6.940699 0.000057 $5.77 $14.88 -$9.11
Speculative
Week 0.000000 48.584896 0.000402 $40.37 $104.16 -$63.79
Month 0.000000 208.220982 0.001724 $173.01 $446.40 -$273.39
Historical
Last Hour 0.000000 0.362768 0.000003 $0.30 $0.62 -$0.32
Last Day 0.000000 6.940699 0.000057 $5.77 $14.88 -$9.11
Last 3 Days 0.000000 14.113992 0.000117 $11.73 $44.64 -$32.91
Last Week 0.000000 38.654407 0.000320 $32.12 $104.16 -$72.04
Exchange Rates
Exchange Current Rate Volume 24h 24h Rate 3d Rate 7d Rate
XeggeX 828.1826 sat 0.02 BTC 859.1255 sat 840.0668 sat 816.3321 sat
Mining Pools
Pool Location Fee Hashrate Hashrate % Miners
Zergpool Scrypt EU 0.50% 13.42 Mh/s Multi-coin pool 2
Bowserlab Scrypt 1.00% 0.00 h/s Multi-coin pool 0
zpool Scrypt EU, US 1.00% 0.00 h/s Multi-coin pool 0
Mining-Dutch EU 2.00% 10.02 Th/s 140.3% 6701