• Release date Apr 2024
  • This ASIC is not yet available!
    All calculations are estimates. The profitability will likely change after the miner is released.
  • Manufacturer page Antminer S21 Hydro
  • SHA-256 335.00 Th/s @ 5360W
Th/s
DGB
W
%
BTC
$/kWh
$
$
Estimated Rewards
Per Fees Est. Rewards Rev. BTC Rev. $ Cost Profit
Hour 0.000000 59.018600 0.000011 $0.68 $0.54 $0.14
Day 0.000000 1,416.446399 0.000255 $16.31 $12.86 $3.45
Speculative
Week 0.000000 9,915.124791 0.001785 $114.16 $90.05 $24.12
Month 0.000000 42,493.391963 0.007649 $489.27 $385.92 $103.35
Historical
Last Hour 0.000000 53.913656 0.000010 $0.62 $0.54 $0.08
Last Day 0.000000 1,416.446399 0.000255 $16.31 $12.86 $3.45
Last 3 Days 0.000000 4,383.869804 0.000789 $50.48 $38.59 $11.88
Last Week 0.000000 11,548.829703 0.002079 $132.97 $90.05 $42.93
Exchange Rates
Exchange Current Rate Volume 24h 24h Rate 3d Rate 7d Rate
Binance 18.0000 sat 0.68 BTC 18.1133 sat 18.1169 sat 18.9745 sat
Graviex 18.5000 sat 0.00 BTC 18.4405 sat 18.4738 sat 18.9810 sat
Mining Pools
Pool Location Fee Hashrate Hashrate % Miners
Zergpool SHA-256 EU 0.50% 2.23 Ph/s Multi-coin pool 30
zpool SHA-256 EU, US 1.00% 368.38 Th/s Multi-coin pool 66
CoinMinerz EU, US, ASIA 1.00% 86.38 Th/s 0.2% 6
dgb256.online 1.00% 5.13 Ph/s 9.4% 80
Mining-Dutch EU 2.00% 7.82 Ph/s 14.3% 79